The operation sequence of rail cable reel trailer
2020-01-10The operation sequence of rail cable reel trailer
Rail cable reel trailer start-up sequence: 1. Turn on the power of the control cabinet and observe if there is any abnormal situation. 2. Press the control button to move the rail cable reel transfer cart a few times. 3. After confirming that there are no abnormal conditions, work is officially started.
Steps to shut down the electric flat car normally: 1. Move the rail cable reel transfer carriage to the end of the track and cut off the power of the control box. 2. Clean up the debris on the flat car and the track.
The body of the electric flat car is a steel structure, the table is tiled with steel plates, and the welded frame. The frame is welded by section steel—I-beam and steel plate. The electric flat car's power supply system directly supplies V360 AC power with a cable drum. The cable drum is hysteresis-coupled to ensure that the cable is evenly stressed and not easily pulled.
Damage to the needle roller cage of electric flat car bearings, wear of long and short shaft journals and needles, etc., can cause the bearing to rotate poorly and cause mechanical noise. At this time, the gear pump needs to be disassembled and the needle bearings replaced; electric flat car pumps The coaxiality with the engine coupling is poor. The coaxiality should be kept within 0.1mm.











